Quality

Built to IS codes. Tested, not just inspected.

Every Buildryt home is designed, built and tested to Indian Standards. Every concrete pour is cube-tested at an NABL-accredited lab, and every report goes into your app, so you can see the evidence rather than take our word for it.

IS 516

Every concrete pour cube-tested

Cubes from every slab, beam and column pour are tested for strength at 7 and 28 days at an NABL-accredited lab.

IS 1786 · IS 269

Steel and cement checked on arrival

Every lot of TMT steel and every batch of cement comes with a test certificate, and steel is checked for diameter and weight on site.

In your app

Every report, stage by stage

Test reports, certificates and check sheets are filed in the Buildryt app before you approve a stage for payment.

What we check at every stage

BRYT-CQCS is our quality checklist, built on these Indian Standards. A stage is released for payment only after its checks pass and you approve it.

StageIndian StandardWhat we checkHow oftenWhat you get
SoilIS 1892, IS 2720Soil investigation and bearing capacity before designOnce per plotSoil report
Structural designIS 456, IS 875, IS 1893, IS 13920RCC design for loads, earthquake zone and ductile detailingOnce per projectSigned structural drawings
CementIS 269 (OPC), IS 1489 (PPC)Grade, BIS mark, manufacturer test certificateEvery batch deliveredTest certificate
TMT steelIS 1786Grade (Fe 500D / 550D), test certificate, bar diameter and weightEvery lot deliveredTest certificate and check sheet
AggregatesIS 383, IS 2386Grading and silt contentEvery new sourceCheck sheet
ConcreteIS 456, IS 1199, IS 516Slump at the pour; cube strength at 7 and 28 daysEvery slab, beam and column pourLab cube test report
MasonryIS 1077, IS 2185, IS 2212Unit strength and size, mortar mix, plumb and lineEvery new batch; daily on siteCheck sheet with photos
PlasterIS 1661Mix, thickness and curingEach floorCheck sheet
WaterproofingIS 3370, IS 2645Sump and tank design; flood test on terraces, bathrooms and balconiesEvery wet area before tilingFlood-test photos and video
ElectricalIS 732, IS 694, IS 3043Wiring practice, cable standard, earthing, insulation resistanceBefore handoverTest readings
PlumbingIS 4985, IS 15778, IS 1172Pipe standard and pressure testBefore pipes are concealedPressure-test record

Free download

The IS-code checklist for building your home

A two-page checklist to take to every builder meeting and site visit: 21 documents, stage by stage, each with the Indian Standard behind it. Tick an item only when you have seen the paper.

New to IS codes? Read the 12 codes that matter for a house, in plain English.

Thanks. Your checklist is ready.Download the checklist (PDF)
That didn't go through. Please try again, or WhatsApp us on +91 97759 49775 and we'll send the checklist.

Five reports to ask any builder for

Use this list with every builder you compare, including us. A builder who works to IS codes will have every one of these.

1. A soil report for your plot

The foundation design should start from tested soil (IS 1892, IS 2720), not an assumption.

2. Structural drawings signed by an engineer

Designed to IS 456 for concrete and IS 1893 for earthquake loads.

3. Cube test reports for every pour

7-day and 28-day strength results to IS 516, from an NABL-accredited lab, for each slab, beam and column pour.

4. Steel and cement test certificates

For every lot of TMT steel (IS 1786) and every batch of cement (IS 269 or IS 1489).

5. Flood-test proof for every wet area

Photos or video of terraces, bathrooms and balconies held under water before tiling.

See the reports from a home we are building

Ask for a sample cube test report and a site visit. Mon–Sat, 10am–6pm.